8/22 pivot · class canceled · 8-week revamp · doors stay · not a launch fire

School doors stay. Launch pressure is off.

Next month’s cohort is canceled. C rebuilds school-live on a revamp track. These doors stay findable. Script login is not GREEN. Do not hunt URLs. Today’s A fire is the HMR caregiver desk human-proof, not this pack.

Guinea-pig (you · Mom · Akaia)

  1. You as Donny — Donny run-sheet · door student-portal.html
  2. Akaia as student — Akaia run-sheet · same student door
  3. Mom as teacher — Mom run-sheet · door instructor-portal.html

How-to (cursors own these)

Still waiting (do not fake it)

Pass = you three can open the right door and see the live August class. Fail = employee portal, a .com Workspace login, or the old shell class.